Step by Step Creation of a Parametric Estimate in DSS and CES
Growth Cycle of the Project Cost Estimate
Parametric PreparationPhase One
Parametric PreparationPhase One (Continued)Examples: ITEMLIST.itemclss in Ohio
Parametric PreparationPhase One (continued)
Parametric PreparationPhase One (Continued)Examples: DPROPOSL.CNPRPWRK in Ohio
Parametric PreparationPhase Two
Default Cost Groups
Ohio DOT Cost Groups
Cost Group Items (Asphalt)
Historical Cost Group Regression Model (HCREG)
2-Lane Resurfacing ExampleStep 1: Conceptual (Infant)
2-Lane Resurfacing ExampleStep 2 - Parametric (Toddler 18 months)
2-Lane Resurfacing ExampleStep 3 - Parametric (Toddler 2 years)
2-Lane Resurfacing ExampleStep 4 - Parametric (Toddler 3 years)
Growth Cycle of the EstimatePreliminary (Teenagers)
PPT Slide
Email: jmcallis@dot.state.oh.us
Home Page: http://www.cloverleaf.net/public/TUG
Best experienced with Click here to start.
Download presentation source